Cryptocurrency Mining Co-Locate Services

 

How much do you charge per month to run a miner?

The hosting fee is based on kilowatts (kW) Used. Standard Plans are considered 1.3kW and Above & Lite Plans are considered Below 1.3 Kw. The hosting fee includes security, facility rental fee,electricity, Internet, and cooling.

Some examples are as follows:

  • Bitmain Antminer S9: ~1.4 kW →  $199.99 CAD/Month
  • 6x RX Vega 56 GPU Miner ~1.38 kW →  $199.99 CAD/Month
  • Bitmain Antminer D3: ~1.2 kW →  $149.99 CAD/Month

What are the hosting packages and what is included?

  • This is a reservation for a hosting contract in one of our Mining Centers
    • Miner Hosting in CAD:
      • < Below 1.3kW → $149.99 CAD /Month + $30 CAD One time Setup Fee
      • > Above or Equal 1.3kW → $199.99 CAD /Month + $30 CAD One time Setup Fee

What is included in the setup fee?

  • Unboxing, setup of miner
  • Internet access
  • Ambient cooling
  • Provisioning of Miner (extra $20 Fee)
  • All switching and routing equipment
  • Ethernet and Powering Cable

Mining Pools

  • You may always use your pool of choice when mining with us
  • Please Make sure to set this up prior to dropping off or notify us in provisioning

What is a kilowatt-month (kW-month)?

  • A kilowatt is 1000 watts or 1000 joules/second. A kilowatt-month is 1000 watts used (constantly) over the period of a month.

Do you provide VPNs?

  • On request we provide VPNs to clients who host 20+ miners with our facilities

What forms of payment do you accept?

  • Bitcoin / Etherum / Bitcoin Cash / Litecoin Payments
  • Visa, MasterCard, AMEX, Cash, Money Order, EMT
  • All hosting services are provided at a minimum length of 3 Month, with the first 3 months requiring payment upfront.

Is there an agreement to sign?

  • Yes, there is an agreement that must be signed to protect both the customers and ourselves

Are there duties?

  • Yes, All Ontario Residents are subject 13% HST Tax 

Where are you based?

  • We are based in London, Canada. All Miners are set up in London, Canada

Where are your data centers located?

  • Our first data center is located at 41 Oxford St W London, Ontario,Canada
    • Availability - SOLD OUT
  • Our second data center is located in Venneck, Canada
    • Availability - Now taking Reservations
    • 56 kW capacity sourced from hydroelectricity

Do I pay for shipping my miners to your data center?

  • Yes, delivery of equipment will be made by the customer at their own risk.
  • Customers are welcome to drop off in person. 

How long does setup of miners take?

  • Setup time ranges from as short as a few hours to 1 day depending on number of units being installed.

What is your uptime guarantee?

  • 95-99% is our typical up-time. 
  • Refunds for the downtime will be issued on confirmation of reason. If TechAlley Computer determines our equipment malfunctioned.
  • Malfunction or broken miners will be returned to customers at our discretion and shipping is customers responsibility.

Can I host GPUs?

  • Yes, however hosting GPUs is a custom request and will require you to contact us beforehand to discuss setup

Can I swap hardware mid-contract?

  • We do not allow exchange of hardware mid-contract.

Do you provide power supplies?

  • Customers are required to provide a power supply that is 80-Plus Gold rated with active power-factor-correction.
  • We Do however sell Power Supply's 

What happens after the contract ends?

  • You may choose to renew your contract or have your miners shipped out of the facility

How can i get started with a contract?

Please Call us at 519-660-6160 or reach us by email at chris@techalley.ca